0
APPLICATION BRIEFS

Early Supplier Involvement in New Product Development With WeBid: A Case Study on Video Conferencing System

[+] Author and Article Information
G. Q. Huang, J. B. Zhao, K. L. Mak

Department of Industrial and Manufacturing Systems Engineering, University of Hong Kong, Pokfulam Road, Hong Kong

J. Comput. Inf. Sci. Eng 3(4), 363-365 (Dec 24, 2003) (3 pages) doi:10.1115/1.1618818 History: Received October 01, 2001; Revised July 01, 2003; Online December 24, 2003
Copyright © 2003 by ASME
Your Session has timed out. Please sign back in to continue.

References

Bidault,  F., Despres,  C., and Butler,  C., 1998, “New Product Development and Early Supplier Involvement (ESI): the Drivers of ESI Adoption,” Int. J. Technology Management, 1/2(15), pp. 49–69.
Fleischer, K., and Liker, J. K., 1998, “Supply Chain Involvement,” Chapter 5, Concurrent Engineering Effectiveness: Integrating Product Development Across Organisation, Hanser Gardner Publications, pp. 113–139.
Roy,  R., and Potter,  S., 1996, “Managing Engineering Design in Complex Supply Chains,” Int. Journal of Technology Management, 4(12), pp. 403–420.
Bonaccorsi,  A., and Lipparini,  A., 1994, “Strategic Partnerships in New Product Development: An Italian Case Study,” Journal of Product Innovation Management, 2(11), pp. 134–145.
Dowlatshahi,  S., 1997, “The Role of Product Design in Designer-Buyer-Supplier Interface,” Production Planning & Control, 6(8), pp. 522–532.
Twigg,  D., 1998, “Managing Product Development Within a Design Chain,” Int. J. Operat. Product. Manage., 5(18), pp. 508–524.
Kromker,  M., Thoben,  K. D., and Wickner,  A., 1997, “An Infrastructure to Support Concurrent Engineering in Bid Preparation,” Comput Ind., 2–3(33), pp. 201–208.
Culley,  S. J., Boston,  O. P., and McMahon,  C. A., 1999, “Suppliers in New Product Development: Their Information and Integration,” J. Eng. Design, 1(10), pp. 59–75.
Huang,  G. Q., and Mak,  K. L., 2000, “WeBid: A Web-Based Framework to Support Early Supplier Involvement in New Product Development,” International Journal of Robotics and Computer Integrated Manufacture, 2–3(16), pp. 169–179.
Huang,  G. Q., and Mak,  K. L., 2000, “Modelling the Customer-Supplier Interface Over the World Wide Web to Facilitate Early Supplier Involvement in New Product Development,” Institution of Mechanical Engineers Proceedings, Part B Journal of Engineering Manufacture, 9(214), pp. 759–769.
Huang, G. Q., and Mak, K. L., 2003, “Brokering the Customer-Supplier Partnership in Product Design and Realization Over the World Wide Web,” IIE Trans., Accepted for publication.

Figures

Grahic Jump Location
Overall partnership indices for seven subsystems
Grahic Jump Location
Comparison of Overall Satisfaction Indices before and after considering “Price”

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In